MIL-T-48586A (AR)
4.2.1 Inspection conditions. Unless otherwise specified,
all examinations and tests shall be conducted at the following
standard ambient conditions:
+50°F to +90°F
Temperature
a.
90% RH Max.
b.
Relative humidity
28 to 32 inches Hg
Pressure
c.
4.3 First article inspection.
4.3.1 Submission. The contractor shall submit a first
article sample as designated by the Contracting Officer for
evaluation in accordance with provisions of 4.3.2. The first
article sample shall consist of the assemblies, components and
test specimens listed below in the quantities indicated.
Drawing
Quantity
Name
1
11736249
Test Set
4.3.2 Inspections to be performed. As determined by the
Government, the first article assemblies, components and test
specimens may be subjected to any or all of the examinations and
tests specified in Table II (Functional tests) and Table III
(Special sampling) herein and be inspected for compliance with
any or all requirements of the applicable drawings.
4.3.3 Rejection. If any assembly, component or test
specimen fails to comply with any of the applicable requirements,
the first article sample shall be rejected. The Government
reserves the right to terminate inspection upon any failure of an
assembly, component or test specimen to comply with any of the
requirements.
Quality conformance inspection.
4.4
4.4.1 Inspection lot formation. The term "inspection lot"
is defined as a homogeneous collection of units of product from
which a representative sample is drawn or which is inspected 100
percent to determine conformance with applicable requirements.
Units of product selected for inspection shall represent only the
inspection lot from which they are drawn and shall not be
construed to represent any prior or subsequent quantities
presented for inspection. Homogeneity shall be considered to
exist provided the inspection lot has been produced by one
8