MIL-F-81959(AS)
4.
QUALITY ASSURANCE PROVISIONS
Responsibility for Inspection - Unless otherwise specified
4.1
in the contract or purchase order. the supplier is responsible for the per-
formance of a 1 inspection requirements as-specified herein. Except as
otherwise specified, the supplier may utilize his own facilities or any
commercial laboratory acceptable to the Government. The Government reserves
the right to perform any of the inspections set forth in the Specification
where such inspections are deemed necessary to assure supplies and services
conform to prescribed requirements.
Classification of Tests - Items covered by this specification
4.1.1
shall be subjected to the following tests to determine compliance with all
applicable requirements:
(1) Preproduction Tests
(2) Acceptance Tests
Preproduction Tests - Preproduction tests shall be made on
4.2
an equipment representative of the production equipments to be supplied under
the contract. Preproduction tests shall be accomplished under the responsi-
bility of the contractor and shall be conducted in accordance with the approved
test procedure of 4.4. The government inspector and the procuring activity
shall be advised when tests are . be conducted so that a representative may
be designated to witness or supervise the tests when so desired. Contractors
not having adequate facilities to conduct all required tests shall obtain the
services or a commercial testing laboratory acceptable to the Government.
4.2.1
Preproduction Test Data - The contractor shall submit all
data collected in conducting these tests to the procuring agency for review
and approval.
4.2.2 Scope of Tests - Preproduction tests shall include all tests
deemed necessary y t e procuring activity to determine that the equipment
meets all the requirements of this specification and the contract. Pre-
production test shall include environmental and interference tests in accordance
with the requirements of MIL-T-5422 and MIL-STD-461 to the limits specified
in MIL-T-21200,
Preproduction Approval - Approval of the preproduction sample
4.2.3
shall be by the procuring activity upon satisfactory completion of all tests.
No production equipments shall be delivered prior to the approval of the pre-
production sample. Prefabrication of production equipment prioer to the approval
of the preproduction sample is at the contractor's own risk, The approved
preproduction sample shall be retained by THE contractor for his use in the
fabrication and testing of equipment to be submitted for acceptance. The pre-
production sample shall not be considered as one of the equipments under the
contract.
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business