MIL-C-70590B (AR)
Switch function check indicator.
TABLE II.
VOLTAGE APPLIED TO
SWITCH FUNCTION CHECK
SWITCH POSITION
CONNECTOR AND PIN
J23-r
A
J23-p
B
J23-d
C
J23-m
D
J22-AM
E
F
J23-b
G
J22-j
H
J22-AF
J23-c
I
3.5.3 CONTINUITY CHECK indicator. After +22.0
0.1 Vdc is
applied between the specified pin in Table III (Continuity check
indicator) and GROUND, the CONTINUITY CHECK indicator lamp shall
light only when the CONTINUITY CHECK switch is in the position
specified in Table III.
TABLE III.
Continuity check indicator.
VOLTAGE APPLIED TO
CONTINUITY CHECK
SWITCH POSITION
CONNECTOR AND PIN
2
J22-BT
3
J22-BU
4
J22-BS
5
J22-AZ
6
J22-AR
7
J22-BD
8
J22-a
9
J22-h
3.5.4 POTENTIOMETER SELECT switch.
3.5.4.1 TEST POINT NO. 1 (TP1). With +24.0
0.1 Vdc applied
between TEST POINT NO. 1 (TP1) and GROUND, there shall be +24.0
0.1 Vdc between the pins specified in Table IV (Test point no.
and GROUND when the POTENTIOMETER SELECT switch is in the position
specified in Table IV.
9
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business